The Building of Pearl Bali

The Hull has emerged from the mould.

The Hull has emerged from the mould.

 

Hull 04

 

 

Hull 02

Hull internal structure 03

Hull internal structure 04

 

The deck going on 1

The deck going on 1

 

The deck going on 2

The deck going on 2

 

The deck going on 3

The deck going on 3

 

Interior tacking shape

Interior tacking shape

 

Rear view - craftsmen are busy

Rear view – craftsmen are busy

Underside from front - Anti-foul just applied

Underside from front – Anti-foul just applied

 

Mast Step ready for mast

Mast Step ready for mast

 

View from port bow looking back at salon and flybridge

View from port bow looking back at salon and flybridge

 

Port side Solar Panels

Port side Solar Panels

 

Galley and Nav Station under construction

Galley and Nav Station under construction

 

Nav Station wiring

Nav Station wiring

 

Up over signs 01

The journey from the factory to the harbour. The lorry lifts Pearl Bali above the street signs….

Low down under bridge 01

and then lower down to creep under a bridge…

Up over signs 02

and up again

 

Ready for mast to be fitted 01

Waiting for the mast to be fitted and to be lifted into the sea for the first time.

The WiFi-Bat is mounted from the mast. This high power, long range, easy to use outdoor grade WiFi antenna will help us with our Internet connectivity whilst at anchor.

The WiFi-Bat is mounted from the mast. This high power, long range, easy to use outdoor grade WiFi antenna will help us with our Internet connectivity whilst at anchor.

Top of mast 01

The top of the mast, showing the Tri-Colour navigation lamp and an upside down aerial.